FIWO FOR YOUR INDUSTRY

Different sites.
One clear way to work.

Capture the work where it happens. Give the office a report it can use.

Find your workflow
Marine, HVAC and facilities technicians reporting their work on site, with notes: cleaned the condenser and replaced one filter; checked lighting and scheduled follow-up; inspected generator room; and a structured report
Marine service technician logging work on a tablet in a motor yacht saloonAurora 72Private vessel • 72 ft
MARINE SERVICE & REFIT

Marine service
& refit

Keep every crew, space and repair connected.

Vessels & assetsMixed crewsJob history
Explore marine workflows
Aurora 72In service

Private vessel • 72 ft • IMO 1234567

OverviewJobsAssetsHistory
SpacesEntire vesselMain deckEngine roomGenerator roomHVACElectricalGuest areasExteriorSystems
Current job
Generator room inspectionIn progress
Technician
Lee CarterMarine EngineerToday, 10:24
Voice report
00:28

Inspected generator room. All systems normal. Tightened belt and cleaned area.

Materials usedBelt (generator)1Cleaning supplies1
HVAC & FIELD SERVICE

HVAC & field service

From fault finding to a confirmed service record. Explore HVAC

  1. DiagnosisAC not cooling
  2. Work performedCleaned condenser
  3. Parts used1 × MERV 8 filter
  4. Follow-upin 3 months
HVAC technician recording a voice report on his phone beside a condenser
Service history
AC-3ARoof - East WingTrane XR16
LocationRiverside Medical CentreScan for full historyService records, photos and reports
FACILITIES, INSTALLATIONS & MAINTENANCE

Three ways to keep sites running.

Facilities technician reviewing assigned jobs outside a modern office building
Assigned jobsLobby lighting checkRiverside HQAir handling unitWest buildingFire door inspectionEast wingLift service checkMain building

Facilities

Keep multiple sites and teams aligned.

Explore facilities
Installation technician fitting a wall-mounted control unit
Job completionWork completedPhoto attachedMar 12, 2025 • 14:32

Installations

Capture on-site work with clear records.

Explore installations
Maintenance technician checking asset history in a plant room
Asset historyBoiler B-01Plant roomMar 12, 2025Routine serviceDec 3, 2024Filter replacementSep 18, 2024System checkRecommended follow-upCheck in 3 months

Maintenance

Stay ahead with asset history and follow-up.

Explore maintenance

Keep each job
simple.

From a voice note to a job you can close.

1Assign

Set the job and share with your team.

2Record

Capture details on site, hands free.

3Review

Check the report against the recording.

4Follow up

Keep work on track and sites running.

Worker confirmed

Work recorded.
Details checked.

Bring clarity to your next site visit.

Same work. A clearer way to capture it.